林志英,杨恒山.双坡阶段渐变率控制分析[J].南华大学学报(自然科学版),2015,29(1):120~123, 128.[LIN Zhi-ying,YANG Heng-shan.The Analysis of Gradual Change Ratio inthe Double Way Gradient Stage[J].Journal of University of South China(Science and Technology),2015,29(1):120~123, 128.] |
双坡阶段渐变率控制分析 |
The Analysis of Gradual Change Ratio inthe Double Way Gradient Stage |
投稿时间:2014-03-15 |
DOI: |
中文关键词: 公路设计 超高渐变率 纵坡 综合纵坡 |
英文关键词:highway design gradual change ratio longitudinal slope grade comprehensive longitudinal slope grade |
基金项目:湖南省科技计划基金资助项目(2011GK3166) |
|
摘要点击次数: 634 |
全文下载次数: 730 |
中文摘要: |
在目前公路设计中,当双坡阶段的超高渐变率小于1/330时,设计者需要对其进行调整.本文通过分析提出,是否需要对双坡阶段进行调整,不取决于超高渐变率,而应取决于由原纵坡和超高渐变率组合而成的综合坡度.从而提出了一个新的概念:综合纵坡.并通过设计案例进一步分析总结了何种情况下综合纵坡不满足要求以及相应调整方案. |
英文摘要: |
In the current highway design,when the gradual change ratio of the double slop phase is less than 1/330,designers need to make some adjustment.Through anaylsis,this artical points out that whether it is necessary to carry on the adjustment to the double slope phase does not depend on the gradual change ratio,but should depend on the comprehensive grade by the original longitudinal slope grade and the gradual change ratio combination.Then it puts forward a new concept:comprehensive longitudinal slope grade.And at last through the design case the article further analyzes and summarizes the circumstances under which a comprehensive longitudinal slope does not meet the requirements and the corresponding adjustment scheme. |
查看全文 查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|