贺海生,黄仕元.潜水泵房的技术经济分析[J].南华大学学报(自然科学版),2001,(3):56~58.[.Technical and Economic Analysis of Construction Phreatic Pmnping Station in Intake Works[J].Journal of University of South China(Science and Technology),2001,(3):56~58.] |
潜水泵房的技术经济分析 |
Technical and Economic Analysis of Construction Phreatic Pmnping Station in Intake Works |
修订日期:2000-10-19 |
DOI: |
中文关键词: 取水工程 潜水泵房 技术经济分析 |
英文关键词:intake works,phreatic pumping station,technical and ecnomic analysis, |
基金项目: |
贺海生 黄仕元 |
贺海生(株洲市自来水公司,湖南株洲,412000) 黄仕元(南华大学建筑工程与资源环境学院,湖南衡阳,421001)
|
摘要点击次数: 913 |
全文下载次数: 4 |
中文摘要: |
本文以株洲市第四水厂潜水泵房建设为例,根据潜水泵的特点,对取水工程中的潜水泵房与干式泵房进行了经济技术比较. |
英文摘要: |
Taking the constrction of phreatic station of No4 Zhuzho ci ty water corporation for example and according to the characteristic of phreatic p ump,in this paper,technical and economic comparision is compared by constructing phreatic pumping station and a dry pumping station in intake work. |
查看全文 查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|