袁华山,宁勇飞.轻型井点施工中几个问题的分析与探讨[J].南华大学学报(自然科学版),2001,(2):52~54.[.Analysis and Approach of Several Problems in Light Well Point Construction[J].Journal of University of South China(Science and Technology),2001,(2):52~54.]
轻型井点施工中几个问题的分析与探讨
Analysis and Approach of Several Problems in Light Well Point Construction
  修订日期:2001-03-02
DOI:
中文关键词:  地下水  轻型井点  粘土填塞  总管坡度
英文关键词:ground water,light well,clay refilling,total pipe slope,
基金项目:
袁华山  宁勇飞
袁华山(南华大学建筑工程与资源环境学院,湖南衡阳 421001)
宁勇飞(南华大学建筑工程与资源环境学院,湖南衡阳 421001)
摘要点击次数: 859
全文下载次数: 1
中文摘要:
      通过对轻型井点降水工程的实践观察及模型模拟试验,对规范要求中粘土回填和总管上倾坡度等问题进行分析,并提出了自己的观点.
英文摘要:
      In this paper, through practice and observation and model test for light well point drainage project, several problems such as clay refilling and slop of total pipe required in standards are analyzed. Some viewpoints are put forward.