张凯,肖东生,李万邦.基于层次分析法的核电站工程建造方式选择研究[J].,2007,8(3):127-130
基于层次分析法的核电站工程建造方式选择研究
Design and Option for the Way of Construction in Nuclear Power Station Based on AHP
  修订日期:2007-01-12
DOI:
中文关键词:  层次分析法,核电,专家选择系统
English Keywords:AHP,Nuclear Power,Expert Choice
Fund Project:
ZHANG Kai  XIAO Dong-sheng  LI Wan-bang
摘要点击次数: 1012
全文下载次数: 1
中文摘要:
      设计和选择适用的建造方式是核电站能够顺利建成的重要基础。文章在核电站工程建造方式的选择中引入层次分析法,提出了基于层次分析法的建造方式选择方法。该方法通过明确核电站工程建造方式的类型及特点、识别影响核电站工程建造方式选取的因素、层次分析结构的建模、判断矩阵的构造和排序,为核电站建造方式选取这一问题提供参考。
English Summary:
      Correct design and option for the way of construction is the important basis for the founding of nuclear power station.The paper cites the AHP in the engineering construction adaptation,coming up with the adaptation of construction based on AHP.The way provides some reference on how to build the nuclear power station by making clear of the style and feature of the way on nuclear power station,choosing the factors of influencing the construction of nuclear power station,modeling of analytic hierarchy process,construction of judgment matrix and risk factors' ranking.
查看全文  查看/发表评论  下载PDF阅读器